Red Mill

Topsham, ME
  • Architect
    SRL Architects
  • Project Manager
    Michael Hebert
  • Contract Type
    Guaranteed Maximum Price
  • Status
    Completed - 2009
  • Cost of Construction
    $2.8 M
  • Size
    37,000 sf
  • Reference Contact
    info@hebertconstruction.com

4-Story structured steel-framed building with a brick masonry veneer and vaulted roof structure. Built to suit office space located on the bank of the Androscoggin River. The structure was designed to blend in with the surrounding late 19th century architecture.

Have a project to discuss?